

We monitor the critical slopes along 14,000 km of network. Rain accumulated over 96 h is crossed with soil saturation, the geometry of each slope and the stretch’s landslide history. When the risk crosses the threshold, the operation gets the alert with the exact km and the window to act: slow down or stop the train before the event.




